§ 611-2. Requirements.  


Latest version.
  • A. 
    The applicant for construction of any subsurface wastewater system in the Town, except for repairs of existing systems which have failed and are not being enlarged to provide for additional building construction or use, shall submit a groundwater impact report (GIR) to the Board of Health. In the case of a subdivision, the GIR shall be submitted at the time of submittal of the preliminary plan. In case of lots not requiring approval as a subdivision, the GIR shall be submitted at the time of application for a disposal works construction permit.